Kevin made new backs for two cupboards that had holes at the back. He also washed spare bedroom window outside and wiped down the stained walls and skirting board.
The steam cleaner isn't working so Joan tidied up a little outside, mopped the kitchen and dusted the lounge.
So this was the first time we really got to see what we had bought. We got the keys on 21st but decided to leave it for three days before we went in to stay extra safe. And we found we had a potential third bedroom in the loft that someone had begun installing. There was already a Velux in.
Comments
Post a Comment